Task framework

A checklist per loan product. Another per investor. Another per branch. Another a senior processor keeps in her head. The task framework replaces that with one list generated from the loan in front of you — and keeps it current as the loan changes.

How the list is built

The moment an application exists, eqLend generates the document and task list from loan-level detail: product, investor, occupancy, property type and borrower structure. It is not a master template that gets pruned down, which is why it does not carry items that never applied to this file.

The list is regenerated as the loan changes. A borrower structure change or an investor change updates the tasks, the eFolder documents expected, and the borrower’s needs list without anyone re-running anything.

Four moments where clarity matters

StageWhat eqLend does
At applicationGenerates the document and task list from loan-level detail.
At disclosuresTriggers the complete picture: what is needed, who owns it, and when it is due.
As documents arriveClassifies each document and ties it to the condition it satisfies; flags contradictions with the LOS.
On return from underwritingConditions arrive mapped to the documents and tasks that clear them, rather than as a block of text to decode and redistribute.

Individual and team views

Tasks organise into My Tasks and Team Tasks, so a processor stays on top of their own work while a manager sees the full pipeline. The dashboard filters by team member, branch and task group to surface bottlenecks, with status and due-date overviews across the pipeline.

Notifications are multi-channel — email, SMS and push — so a party waiting on a document does not need to be chased by a human first.

TODO(verify) Confirm the notification channels currently in production, and whether notification rules are lender-configurable (who is notified, on what event, after what delay).

Needs list

Borrower-facing needs list rules determine what is requested and when. This is as much a customer-experience decision as an operational one: asking too early burdens every applicant, asking too late breaks a closing date. Those rules are yours to set — see Rules, ownership and portability.